Home
Project History
Schedule
Images
Documents
FAQ's
Procurement
Archives
Veterans Memorial KCG
Contact
Construction Photos 11-23-12
Week 11-23-12
The first two panels installed on the east end of the structure.
Week 11-23-12
Foti installing brickwork on the second elevation.
Week 11-23-12
Donleys pouring the crash walls on the fifth elevation of the south end.
Week 11-23-12
CMU block at 2nd Floor mezzanine
This
jQuery slider
was created with the free
EasyRotator
software from DWUser.com.
Need a powerful
Flash slideshow
creator with built-in iPhone/iPad/Android support? EasyRotator is supported by the
XML Flash Slideshow v4 Software
.
OK
Rotator powered by
EasyRotator
, a free and easy jQuery slider builder from DWUser.com. Please enable JavaScript to view.