  • Week 11-23-12 Week 11-23-12 The first two panels installed on the east end of the structure.
  • Week 11-23-12 Week 11-23-12 Foti installing brickwork on the second elevation.
  • Week 11-23-12 Week 11-23-12 Donleys pouring the crash walls on the fifth elevation of the south end.