Construction Photos 11-09-12

  • Week 11-09-12 Week 11-09-12 Trench drain prepped with rebar and vapor barrier.
  • Week 11-09-12 Week 11-09-12 Foti installing block work around the door frame on the second elevation.
  • Week 11-09-12 Week 11-09-12 Foti continuing to lay brickwork on the south end retail spaces.
  • Week 11-09-12 Week 11-09-12 Donley's installing concrete for the walk on the south end of the bus bay.