Home
Project History
Schedule
Images
Documents
FAQ's
Procurement
Archives
Veterans Memorial KCG
Contact
Construction Photos 11-09-12
Week 11-09-12
Trench drain prepped with rebar and vapor barrier.
Week 11-09-12
Foti installing block work around the door frame on the second elevation.
Week 11-09-12
Foti continuing to lay brickwork on the south end retail spaces.
Week 11-09-12
Donley's installing concrete for the walk on the south end of the bus bay.
This
jQuery slider
was created with the free
EasyRotator
software from DWUser.com.
Need a powerful
Flash slideshow
creator with built-in iPhone/iPad/Android support? EasyRotator is supported by the
XML Flash Slideshow v4 Software
.
OK
Rotator powered by
EasyRotator
, a free and easy jQuery slider builder from DWUser.com. Please enable JavaScript to view.