Construction Photos 01-18-13

  • Week 01-18-13 Week 01-18-13 SW Picture.
  • Week 01-18-13 Week 01-18-13 NE Picture.
  • Week 01-18-13 Week 01-18-13 Lockhart installing the catch basin on the west end.
  • Week 01-18-13 Week 01-18-13 Lockhart backfilling the north retaining wall on the east end.
  • Week 01-18-13 Week 01-18-13 Foti installing CMU block on the third elevation of the east end.
  • Week 01-18-13 Week 01-18-13 Foti installing CMU block on the fifth elevation.